Carroll Hollow Mine — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
04/17/2002 04/17/2002 Sterling Mining Corp 4.00 1
11/27/2001 12/12/2001 Sterling Mining Corp 24.25 1
06/26/2001 06/26/2001 Sterling Mining Corp 7.00 1
06/26/2001 07/09/2001 Sterling Mining Corp 23.00 1