CEC Crusher #2 — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/06/2009 | 05/06/2009 | Hettinger Welding LLC | 20.00 | 2 |
| 02/07/2009 | 02/09/2009 | Hettinger Welding LLC | 4.25 | 1 |
| 09/26/2007 | 09/26/2007 | Hettinger Welding, Inc. | 3.75 | 1 |
| 03/11/2007 | 03/13/2008 | Hettinger Welding, Inc. | 5.50 | 1 |
| 07/11/2006 | 07/13/2006 | Hettinger Welding, Inc. | 14.00 | 1 |