CEDAR CREEK PIT — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
06/26/2025 06/30/2025 C.R. PATE LOGGING INC. 16.00 1
03/12/2025 03/12/2025 C.R. PATE LOGGING INC. 7.00 1
07/17/2024 07/20/2024 C.R. PATE LOGGING INC. 18.50 1
12/04/2023 12/05/2023 C.R. PATE LOGGING INC. 6.00 1
11/13/2023 11/16/2023 C.R. PATE LOGGING INC. 12.00 1
06/29/2023 07/03/2023 C.R. PATE LOGGING INC. 4.25 1
11/30/2022 12/01/2022 C.R. PATE LOGGING INC. 8.25 1
09/06/2022 09/09/2022 C.R. PATE LOGGING INC. 12.50 1