CEMEX - 107TH AVE PLANT — Inspections
Total: 7 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 03/25/2010 | 03/25/2010 | CEMEX Construction Materials S... | 2.75 | 1 |
| 01/07/2009 | 01/07/2009 | CEMEX Construction Materials S... | 13.25 | 1 |
| 10/17/2007 | 10/19/2007 | Rinker Materials | 9.75 | 1 |
| 09/04/2007 | 09/05/2007 | Rinker Materials | 8.00 | 1 |
| 11/07/2005 | 11/07/2005 | Rinker Materials | 5.50 | 1 |
| 04/05/2005 | 04/05/2005 | Rinker Materials | 2.00 | 1 |
| 11/02/2004 | 11/03/2004 | Rinker Materials | 14.00 | 1 |