CEMEX - CASA GRANDE — Inspections

Total: 69 inspections

Begin End Operator Hours Inspectors
11/18/2008 11/18/2008 CEMEX Construction Materials S... 9.00 1
02/06/2008 02/07/2008 RINKER MATERIALS 14.25 1
11/19/2007 11/19/2007 RINKER MATERIALS 8.50 1
10/25/2006 11/01/2006 RINKER MATERIALS 25.75 1
08/07/2006 08/08/2006 RINKER MATERIALS 16.50 1
06/13/2006 06/15/2006 RINKER MATERIALS 32.50 1
06/12/2006 06/12/2006 RINKER MATERIALS 3.50 1
01/03/2006 01/11/2006 RINKER MATERIALS 48.50 1
03/25/2005 03/31/2005 RINKER MATERIALS 2.50 1
03/25/2005 03/31/2005 RINKER MATERIALS 8.00 1
11/10/2004 11/15/2004 RINKER MATERIALS 29.00 1
06/08/2004 06/08/2004 RINKER MATERIALS WESTERN INC 8.00 1
05/26/2004 05/26/2004 RINKER MATERIALS WESTERN INC 3.00 1
04/22/2004 04/29/2004 RINKER MATERIALS WESTERN INC 33.00 1
09/23/2003 09/24/2003 RINKER MATERIALS WESTERN INC 13.00 1
10/23/2002 10/23/2002 RINKER MATERIALS WESTERN INC 4.00 1
08/06/2002 08/07/2002 United Metro Materials Inc 12.00 1
04/25/2001 04/25/2001 United Metro Materials Inc 11.00 1
08/15/2000 08/17/2000 United Metro Materials Inc 38.00 1