CEMEX - NOGALES — Inspections

Total: 17 inspections

Begin End Operator Hours Inspectors
08/16/2010 08/18/2010 CEMEX Construction Materials S... 17.00 1
11/03/2008 11/03/2008 CEMEX Construction Materials S... 1.50 1
10/08/2008 10/09/2008 CEMEX Construction Materials S... 16.75 1
02/20/2008 02/20/2008 Rinker Materials 8.25 1
02/08/2007 02/08/2007 Rinker Materials 1.00 1
01/17/2007 01/18/2007 Rinker Materials 9.50 1
05/08/2006 05/11/2006 Rinker Materials 8.25 1
09/29/2005 09/29/2005 Rinker Materials 8.50 1
04/04/2005 04/05/2005 Rinker Materials 3.00 1
03/31/2005 03/31/2005 Rinker Materials 7.00 1
09/15/2004 09/16/2004 Rinker Materials 9.00 1
05/19/2004 05/19/2004 RINKER MATERIALS WESTERN INC 7.00 1
04/29/2003 04/29/2003 RINKER MATERIALS WESTERN INC 13.00 1
09/05/2002 09/06/2002 United Metro Materials Inc 13.00 1
09/05/2001 09/06/2001 United Metro Materials Inc 24.00 2
09/06/2000 09/06/2000 United Metro Materials Inc 10.00 1
01/25/2000 01/25/2000 United Metro Materials Inc 6.00 1