CEMEX SITE — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
11/14/2019 11/14/2019 HARRIS TRANSFER, INC. 4.00 1
06/19/2019 06/19/2019 HARRIS TRANSFER, INC. 3.00 1
06/11/2019 06/12/2019 HARRIS TRANSFER, INC. 14.50 1
10/11/2018 10/11/2018 HARRIS TRANSFER, INC. 10.00 1
05/30/2018 06/01/2018 HARRIS TRANSFER, INC. 25.00 1
12/18/2017 12/18/2017 HARRIS TRANSFER, INC. 5.50 1
05/22/2017 05/22/2017 HARRIS TRANSFER, INC. 9.00 1
07/06/2016 07/06/2016 HARRIS TRANSFER, INC. 7.50 2