04/01/2010 04/01/2010 Tom Beussink Excavating Inc 7.00 1
10/09/2008 10/09/2008 Tom Beussink Excavating Inc 7.50 1
08/05/2008 08/05/2008 Tom Beussink Excavating Inc 3.25 1
02/27/2008 02/27/2008 Tom Beussink Excavating Inc 1.75 1
09/20/2007 09/20/2007 Tom Beussink Excavating Inc 4.00 1
08/28/2007 08/28/2007 Tom Beussink Excavating Inc 11.50 1
06/20/2007 06/20/2007 Tom Beussink Excavating Inc 6.00 1
04/24/2007 04/24/2007 Tom Beussink Excavating Inc 2.00 1
08/22/2006 08/23/2006 Tom Beussink Excavating Inc 7.00 1
07/28/2005 07/28/2005 Tom Beussink Excavating Inc 9.75 1
05/06/2004 05/06/2004 Tom Beussink Excavating Inc 12.00 2
11/07/2002 11/07/2002 Tom Beussink Excavating Inc 5.00 1
10/16/2002 10/16/2002 Tom Beussink Excavating Inc 2.00 1
04/23/2002 04/25/2002 Tom Beussink Excavating Inc 10.00 1
07/02/2001 07/03/2001 Tom Beussink Excavating Inc 0.00 0
06/20/2000 06/20/2000 Tom Beussink Excavating Inc 4.00 1
05/03/2000 05/03/2000 Tom Beussink Excavating Inc 6.00 1
04/26/2000 04/26/2000 Tom Beussink Excavating Inc 6.00 1