Chapperal Plant — Inspections

Total: 87 inspections

Begin End Operator Hours Inspectors
04/02/2003 04/10/2003 Lodestar Energy, Inc 13.50 1
03/25/2003 03/31/2003 Lodestar Energy, Inc 13.00 1
02/15/2003 02/15/2003 Lodestar Energy, Inc 2.50 1
01/17/2003 01/17/2003 Lodestar Energy, Inc 5.50 1
12/31/2002 12/31/2002 Lodestar Energy, Inc 11.00 1
12/30/2002 01/07/2003 Lodestar Energy, Inc 13.00 1
12/18/2002 12/20/2002 Lodestar Energy, Inc 17.50 1
11/06/2002 11/12/2002 Lodestar Energy, Inc 13.00 2
11/04/2002 11/08/2002 Lodestar Energy, Inc 24.00 3
09/19/2002 09/25/2002 Lodestar Energy, Inc 12.00 1
07/08/2002 08/16/2002 Lodestar Energy, Inc 26.50 1
06/28/2002 06/28/2002 Lodestar Energy, Inc 5.00 1
05/06/2002 06/05/2002 Lodestar Energy, Inc 49.00 2
04/16/2002 04/25/2002 Lodestar Energy, Inc 12.00 1
03/20/2002 03/22/2002 Lodestar Energy, Inc 3.50 1
02/04/2002 02/05/2002 Lodestar Energy, Inc 5.00 1
01/23/2002 01/28/2002 Lodestar Energy, Inc 17.00 1
11/26/2001 12/17/2001 Lodestar Energy, Inc 52.50 1
11/15/2001 11/15/2001 Lodestar Energy, Inc 6.00 1
11/15/2001 11/26/2001 Lodestar Energy, Inc 9.50 1
09/13/2001 09/13/2001 Lodestar Energy, Inc 6.00 1
08/13/2001 08/28/2001 Lodestar Energy, Inc 35.00 1
07/11/2001 07/11/2001 Lodestar Energy, Inc 4.00 1
05/31/2001 06/07/2001 Lodestar Energy, Inc 21.00 1
05/23/2001 06/20/2001 Lodestar Energy, Inc 16.50 1
01/29/2001 01/29/2001 Lodestar Energy, Inc 11.00 1
01/05/2001 01/18/2001 Lodestar Energy, Inc 14.00 1
12/18/2000 03/07/2001 Lodestar Energy, Inc 50.75 1
12/14/2000 12/15/2000 Lodestar Energy, Inc 8.00 1
11/07/2000 11/07/2000 Lodestar Energy, Inc 6.00 1
08/15/2000 09/27/2000 Lodestar Energy, Inc 67.00 2
08/10/2000 08/16/2000 Lodestar Energy, Inc 7.00 1
08/10/2000 08/28/2000 Lodestar Energy, Inc 6.00 1
07/07/2000 07/07/2000 Lodestar Energy, Inc 2.50 1
04/25/2000 05/02/2000 Lodestar Energy, Inc 1.00 1
02/09/2000 02/14/2000 Lodestar Energy, Inc 28.00 2
01/12/2000 01/20/2000 Lodestar Energy, Inc 16.25 2