Chickasaw Terminal — Inspections
Total: 23 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/16/2025 | 06/16/2025 | Wiregrass Construction Co., In... | 2.75 | 1 |
| 01/30/2025 | 02/04/2025 | Wiregrass Construction Co., In... | 4.00 | 1 |
| 12/09/2024 | 12/09/2024 | Wiregrass Construction Co., In... | 3.50 | 1 |
| 01/16/2024 | 01/18/2024 | John G. Walton, Construction C... | 5.00 | 1 |
| 03/21/2023 | 03/22/2023 | John G. Walton, Construction C... | 7.50 | 1 |
| 11/30/2021 | 12/02/2021 | John G. Walton, Construction C... | 3.00 | 1 |
| 09/21/2021 | 09/21/2021 | John G. Walton, Construction C... | 3.25 | 1 |
| 11/02/2020 | 11/02/2020 | John G. Walton, Construction C... | 7.00 | 1 |
| 01/16/2020 | 01/16/2020 | John G. Walton, Construction C... | 0.25 | 1 |
| 12/02/2019 | 12/03/2019 | John G. Walton, Construction C... | 8.50 | 1 |
| 03/01/2019 | 03/08/2019 | John G. Walton, Construction C... | 2.75 | 1 |
| 02/21/2019 | 02/21/2019 | John G. Walton, Construction C... | 6.50 | 1 |
| 11/27/2017 | 11/28/2017 | John G. Walton, Construction C... | 8.00 | 1 |
| 09/14/2017 | 09/14/2017 | John G. Walton, Construction C... | 2.00 | 1 |
| 08/16/2017 | 08/16/2017 | John G. Walton, Construction C... | 1.00 | 1 |
| 10/24/2016 | 10/25/2016 | John G. Walton, Construction C... | 18.00 | 1 |
| 10/21/2015 | 10/22/2015 | John G. Walton, Construction C... | 0.75 | 1 |
| 10/21/2015 | 10/22/2015 | John G. Walton, Construction C... | 12.00 | 1 |
| 01/13/2015 | 01/13/2015 | John G. Walton, Construction C... | 1.00 | 1 |
| 01/12/2015 | 01/13/2015 | John G. Walton, Construction C... | 17.00 | 1 |
| 05/08/2014 | 05/08/2014 | John G. Walton, Construction C... | 5.50 | 1 |
| 04/09/2014 | 04/09/2014 | John G. Walton, Construction C... | 13.00 | 1 |
| 04/09/2014 | 04/09/2014 | John G. Walton, Construction C... | 7.25 | 1 |