Chickasaw Terminal — Inspections

Total: 23 inspections

Begin End Operator Hours Inspectors
06/16/2025 06/16/2025 Wiregrass Construction Co., In... 2.75 1
01/30/2025 02/04/2025 Wiregrass Construction Co., In... 4.00 1
12/09/2024 12/09/2024 Wiregrass Construction Co., In... 3.50 1
01/16/2024 01/18/2024 John G. Walton, Construction C... 5.00 1
03/21/2023 03/22/2023 John G. Walton, Construction C... 7.50 1
11/30/2021 12/02/2021 John G. Walton, Construction C... 3.00 1
09/21/2021 09/21/2021 John G. Walton, Construction C... 3.25 1
11/02/2020 11/02/2020 John G. Walton, Construction C... 7.00 1
01/16/2020 01/16/2020 John G. Walton, Construction C... 0.25 1
12/02/2019 12/03/2019 John G. Walton, Construction C... 8.50 1
03/01/2019 03/08/2019 John G. Walton, Construction C... 2.75 1
02/21/2019 02/21/2019 John G. Walton, Construction C... 6.50 1
11/27/2017 11/28/2017 John G. Walton, Construction C... 8.00 1
09/14/2017 09/14/2017 John G. Walton, Construction C... 2.00 1
08/16/2017 08/16/2017 John G. Walton, Construction C... 1.00 1
10/24/2016 10/25/2016 John G. Walton, Construction C... 18.00 1
10/21/2015 10/22/2015 John G. Walton, Construction C... 0.75 1
10/21/2015 10/22/2015 John G. Walton, Construction C... 12.00 1
01/13/2015 01/13/2015 John G. Walton, Construction C... 1.00 1
01/12/2015 01/13/2015 John G. Walton, Construction C... 17.00 1
05/08/2014 05/08/2014 John G. Walton, Construction C... 5.50 1
04/09/2014 04/09/2014 John G. Walton, Construction C... 13.00 1
04/09/2014 04/09/2014 John G. Walton, Construction C... 7.25 1