Chieftain Screen — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
08/06/2025 08/06/2025 Thornton Construction, Inc. 5.00 1
10/11/2023 10/11/2023 Thornton Construction, Inc. 1.50 1
07/21/2023 07/21/2023 Thornton Construction, Inc. 8.25 1