C.I.B. CRUSHER/SCREEN PLANT — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
07/22/2015 07/22/2015 C I B Gravel 3.00 1
07/29/2013 07/30/2013 C I B Gravel 16.25 1
08/07/2012 08/07/2012 C I B Gravel 10.75 1
09/21/2011 09/21/2011 C I B Gravel 6.25 1
09/14/2011 09/14/2011 C I B Gravel 17.50 1
08/30/2010 08/30/2010 C I B Gravel 7.50 1
08/19/2010 08/19/2010 C I B Gravel 19.25 1
08/04/2010 08/04/2010 C I B Gravel 4.50 1
07/21/2010 07/22/2010 C I B Gravel 47.50 2
05/21/2009 05/21/2009 C I B Gravel 14.75 1
04/22/2009 04/23/2009 C I B Gravel 9.50 1
04/21/2008 04/21/2008 C I B Gravel 4.00 1
04/02/2008 04/03/2008 C I B Gravel 24.25 1
07/09/2007 07/12/2007 C I B Gravel 21.25 1
04/05/2007 04/05/2007 C I B Gravel 5.50 1
05/15/2006 05/15/2006 C I B Gravel 1.00 1
04/05/2006 04/11/2006 C I B Gravel 30.50 1
12/29/2004 12/30/2004 C I B Gravel 9.00 1
04/06/2004 04/06/2004 C I B Gravel 1.00 1
04/01/2004 04/08/2004 C I B Gravel 28.00 1
04/01/2003 04/08/2003 C I B Gravel 26.00 1
02/05/2003 02/05/2003 C I B Gravel 5.00 1
01/10/2002 01/17/2002 C I B Gravel 18.00 1
08/29/2001 08/30/2001 C I B Gravel 21.00 2
09/07/2000 09/14/2000 C I B Gravel 47.00 2