COEUR D'ALENE-PRE MIX #4 — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
10/05/2004 10/06/2004 Central Pre-Mix Concrete Co. 26.00 1
05/05/2004 05/05/2004 Central Pre-Mix Concrete Co. 15.00 1
06/04/2003 06/05/2003 Central Pre-Mix Concrete Co. 32.00 1
07/17/2002 07/17/2002 Central Pre-Mix Concrete Co. 9.00 1
04/09/2002 04/09/2002 Central Pre-Mix Concrete Co. 5.00 1
05/21/2001 05/21/2001 Central Pre-Mix Concrete Co. 6.00 1
04/12/2000 04/18/2000 Central Pre-Mix Concrete Co. 22.00 1