Columbus Plant — Inspections
Total: 104 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/11/2000 | 10/11/2000 | The Olen Corporation | 5.00 | 1 |
| 09/27/2000 | 09/29/2000 | The Olen Corporation | 38.00 | 2 |
| 04/05/2000 | 04/06/2000 | The Olen Corporation | 4.00 | 1 |
| 01/10/2000 | 01/12/2000 | The Olen Corporation | 46.00 | 2 |