Columbus Plant — Inspections

Total: 104 inspections

Begin End Operator Hours Inspectors
10/11/2000 10/11/2000 The Olen Corporation 5.00 1
09/27/2000 09/29/2000 The Olen Corporation 38.00 2
04/05/2000 04/06/2000 The Olen Corporation 4.00 1
01/10/2000 01/12/2000 The Olen Corporation 46.00 2