Conant Mine — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/10/2001 | 01/10/2001 | Arch Of Illinois | 8.00 | 1 |
| 12/27/2000 | 12/27/2000 | Arch Of Illinois | 16.00 | 2 |
| 04/03/2000 | 04/03/2000 | Arch Of Illinois | 8.00 | 1 |
| 01/03/2000 | 01/04/2000 | Arch Of Illinois | 11.00 | 1 |