Cozzens Pit — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
07/26/2024 07/26/2024 Fry Gravel & Excavation Inc 4.00 1
03/19/2024 03/19/2024 Fry Gravel & Excavation Inc 1.00 1
03/15/2023 03/15/2023 Fry Gravel & Excavation Inc 5.50 1
08/04/2022 08/11/2022 Fry Gravel & Excavation Inc 14.50 1
03/25/2021 03/26/2021 CS Fry Construction 11.50 1
03/19/2021 03/23/2021 CS Fry Construction 5.00 1
07/30/2020 07/30/2020 CS Fry Construction 1.00 1
04/08/2020 04/08/2020 CS Fry Construction 9.00 1
08/27/2019 08/27/2019 CS Fry Construction 0.00 0
11/20/2017 11/20/2017 CS Fry Construction 1.50 1
06/22/2016 06/22/2016 CS Fry Construction 1.00 1
06/22/2016 06/22/2016 CS Fry Construction 3.50 1
02/01/2016 02/01/2016 CS Fry Construction 2.50 1
03/04/2015 03/04/2015 CS Fry Construction 10.50 1
03/04/2015 03/04/2015 CS Fry Construction 1.00 1
10/22/2013 10/23/2013 CS Fry Construction 12.00 1
02/25/2013 02/25/2013 CS Fry Construction 1.00 1
10/24/2012 10/24/2012 CS Fry Construction 15.00 1
07/30/2012 07/31/2012 CS Fry Construction 16.00 1
07/27/2011 07/27/2011 CS Fry Construction 4.00 1
07/18/2011 07/21/2011 CS Fry Construction 17.00 1
07/12/2010 07/14/2010 CS Fry Construction 14.00 1
03/25/2010 03/25/2010 CS Fry Construction 3.00 1
07/15/2009 07/15/2009 CS Fry Construction 3.75 1
03/20/2008 03/20/2008 CS Fry Construction 7.50 1
02/20/2008 02/21/2008 CS Fry Construction 19.00 1
08/20/2007 08/22/2007 CS Fry Construction 18.00 1