CR4 — Inspections

Total: 33 inspections

Begin End Operator Hours Inspectors
02/11/2026 02/11/2026 Lurre Construction 9.25 1
02/04/2026 02/04/2026 Lurre Construction 18.75 1
03/17/2025 03/17/2025 Lurre Construction 4.75 1
09/10/2024 09/12/2024 Lurre Construction 9.75 1
08/30/2023 08/31/2023 Lurre Construction 2.00 1
08/30/2023 08/30/2023 Lurre Construction 5.00 1
05/17/2023 05/17/2023 Lurre Construction 1.00 1
09/20/2022 09/21/2022 Lurre Construction 14.50 1
01/22/2021 01/22/2021 Lurre Construction 7.75 1
07/23/2020 07/23/2020 Lurre Construction 5.75 1
07/15/2020 07/16/2020 Lurre Construction 23.25 1
09/04/2019 09/04/2019 Lurre Construction 4.75 1
08/22/2019 08/26/2019 Lurre Construction 16.50 1
07/29/2019 07/29/2019 Lurre Construction 2.50 1
07/02/2018 07/02/2018 Lurre Construction 8.75 1
01/17/2018 01/17/2018 Lurre Construction 4.00 1
08/28/2017 08/28/2017 Lurre Construction 3.00 1
08/01/2017 08/02/2017 Lurre Construction 27.75 2
11/09/2015 11/10/2015 Lurre Construction 24.25 1
04/13/2015 04/13/2015 Lurre Construction 5.50 1
03/31/2015 04/02/2015 Lurre Construction 23.50 1
03/17/2014 03/18/2014 Lurre Construction 20.00 1
02/25/2014 02/25/2014 Lurre Construction 2.50 1
06/17/2013 06/18/2013 Lurre Construction 9.00 1
11/29/2011 11/30/2011 Lurre Construction 13.00 1
01/20/2011 01/26/2011 Lurre Construction 21.50 1
02/07/2002 02/07/2002 Lurre Construction 7.00 1
01/14/2002 02/01/2002 Lurre Construction 40.00 1
12/11/2001 12/11/2001 Lurre Construction 4.00 1
10/29/2001 10/29/2001 Lurre Construction 5.00 1
05/30/2001 05/31/2001 Lurre Construction 11.00 1
12/13/2000 12/15/2000 Lurre Construction 22.00 1
05/15/2000 05/23/2000 Lurre Construction 53.00 1