Creech #3 — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
12/21/2001 12/21/2001 Jericol Mining Inc 5.00 1
05/31/2001 05/31/2001 Jericol Mining Inc 4.00 1
01/25/2001 01/25/2001 Jericol Mining Inc 7.00 1
12/05/2000 12/05/2000 Jericol Mining Inc 8.00 1
09/27/2000 09/27/2000 Jericol Mining Inc 3.00 1
06/27/2000 06/27/2000 Jericol Mining Inc 3.00 1
03/28/2000 03/28/2000 Jericol Mining Inc 2.50 1