Crusher #1 — Inspections

Total: 18 inspections

Begin End Operator Hours Inspectors
09/13/2011 09/13/2011 Huachuca Concrete Inc 2.50 1
05/17/2011 05/19/2011 Huachuca Concrete Inc 46.50 1
11/23/2009 11/23/2009 Huachuca Concrete Inc 4.50 1
11/04/2009 11/05/2009 Huachuca Concrete Inc 17.50 1
06/23/2009 06/24/2009 Huachuca Concrete Inc 32.50 1
04/07/2009 04/07/2009 Huachuca Concrete Inc 12.00 1
10/28/2008 10/28/2008 Huachuca Concrete Inc 12.25 1
06/17/2008 06/17/2008 Huachuca Concrete Inc 9.50 1
02/05/2008 02/06/2008 Huachuca Concrete Inc 7.75 2
06/06/2007 06/06/2007 Huachuca Concrete Inc 2.75 1
03/27/2007 03/28/2007 Huachuca Concrete Inc 11.00 1
09/28/2006 09/29/2006 Huachuca Concrete Inc 11.50 1
08/10/2006 08/11/2006 Huachuca Concrete Inc 12.50 1
07/05/2005 07/07/2005 Huachuca Concrete Inc 9.25 1
08/18/2004 08/19/2004 Huachuca Concrete Inc 9.00 1
12/10/2003 12/11/2003 Huachuca Concrete Inc 11.00 1
02/07/2003 02/07/2003 Huachuca Concrete Inc 1.00 1
02/03/2003 02/03/2003 Huachuca Concrete Inc 7.00 1