CRUSHER #2 — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
03/18/2003 03/18/2003 Klamath Pacific Corp 5.00 1
01/09/2003 01/09/2003 Klamath Pacific Corp 20.00 1
05/14/2002 05/15/2002 Klamath Pacific Corp 27.00 1
05/23/2001 05/23/2001 Klamath Pacific Corp 24.00 2
04/27/2000 05/10/2000 Klamath Pacific Corp 64.00 2