Crusher #5 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
03/27/2025 03/27/2025 Colorado Crushing Inc 9.00 1
03/10/2025 03/11/2025 Colorado Crushing Inc 4.50 1
07/10/2024 07/10/2024 Colorado Crushing Inc 10.50 1
03/04/2024 03/04/2024 Colorado Crushing Inc 10.75 1
11/08/2022 11/14/2022 Colorado Crushing Inc 16.25 1
07/09/2022 07/11/2022 Colorado Crushing Inc 13.00 1