Crusher Operation #2 — Inspections
Total: 21 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/17/2026 | 02/19/2026 | LHC., Inc. | 15.00 | 1 |
| 02/09/2026 | 02/11/2026 | LHC., Inc. | 33.25 | 1 |
| 10/01/2025 | 10/03/2025 | LHC., Inc. | 1.50 | 1 |
| 09/29/2025 | 09/30/2025 | LHC., Inc. | 0.50 | 1 |
| 09/22/2025 | 09/24/2025 | LHC., Inc. | 3.25 | 1 |
| 09/02/2025 | 09/03/2025 | LHC., Inc. | 8.00 | 1 |
| 01/21/2025 | 01/23/2025 | LHC., Inc. | 13.75 | 1 |
| 09/23/2024 | 09/24/2024 | LHC., Inc. | 13.50 | 1 |
| 04/03/2023 | 04/03/2023 | LHC., Inc. | 1.50 | 1 |
| 03/29/2023 | 03/30/2023 | LHC., Inc. | 12.50 | 1 |
| 06/14/2022 | 06/14/2022 | LHC., Inc. | 13.25 | 1 |
| 03/07/2022 | 03/08/2022 | LHC., Inc. | 6.00 | 1 |
| 09/07/2021 | 09/09/2021 | LHC., Inc. | 6.00 | 1 |
| 04/21/2020 | 04/21/2020 | LHC., Inc. | 15.25 | 1 |
| 04/06/2020 | 04/07/2020 | LHC., Inc. | 5.00 | 1 |
| 04/11/2016 | 04/12/2016 | LHC., Inc. | 11.75 | 1 |
| 03/30/2016 | 03/30/2016 | LHC., Inc. | 17.00 | 1 |
| 03/30/2016 | 03/30/2016 | LHC., Inc. | 2.00 | 1 |
| 02/02/2016 | 02/02/2016 | LHC., Inc. | 4.00 | 1 |
| 07/22/2015 | 07/22/2015 | LHC., Inc. | 10.25 | 2 |
| 07/22/2015 | 07/22/2015 | LHC., Inc. | 0.75 | 1 |