Crusher Plant #1 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
01/22/2003 01/23/2003 Schermer Construction Inc 17.00 1
08/20/2002 08/20/2002 Schermer Construction Inc 13.00 1
04/23/2002 04/24/2002 Schermer Construction Inc 25.00 1
01/23/2002 01/23/2002 Schermer Construction Inc 11.00 1
09/11/2001 09/11/2001 Schermer Construction Inc 12.00 1
05/30/2001 05/31/2001 Schermer Construction Inc 26.00 1