Darby Mine No 1 — Inspections

Total: 106 inspections

Begin End Operator Hours Inspectors
04/19/2001 05/30/2001 Jericol Mining Inc 9.50 1
03/13/2001 03/13/2001 Jericol Mining Inc 5.00 1
12/06/2000 12/06/2000 Jericol Mining Inc 4.50 1
09/27/2000 09/27/2000 Jericol Mining Inc 3.00 1
06/27/2000 06/27/2000 Jericol Mining Inc 3.00 1
03/28/2000 03/28/2000 Jericol Mining Inc 2.50 1