DIXIANA MINE — Inspections

Total: 65 inspections

Begin End Operator Hours Inspectors
05/24/2005 05/26/2005 Columbia Silica Sand Inc 7.25 1
03/23/2005 03/23/2005 Columbia Silica Sand Inc 3.00 1
11/03/2004 11/04/2004 Columbia Silica Sand Inc 9.00 1
08/03/2004 08/04/2004 Columbia Silica Sand Inc 10.00 1
11/20/2003 11/21/2003 Columbia Silica Sand Inc 8.00 1
05/15/2003 05/15/2003 Columbia Silica Sand Inc 6.00 1
04/16/2003 04/16/2003 Columbia Silica Sand Inc 7.00 1
11/26/2002 11/27/2002 Columbia Silica Sand Inc 5.00 1
11/07/2002 11/07/2002 Columbia Silica Sand Inc 7.00 1
10/25/2002 10/25/2002 Columbia Silica Sand Inc 4.00 1
04/24/2002 04/24/2002 Columbia Silica Sand Inc 17.00 2
12/05/2001 12/05/2001 Columbia Silica Sand Inc 6.00 1
06/25/2001 06/28/2001 Columbia Silica Sand Inc 25.00 1
01/17/2001 01/17/2001 Columbia Silica Sand Inc 11.00 1
05/10/2000 05/10/2000 Columbia Silica Sand Inc 8.00 1