Dragstrip Pit — Inspections
Total: 8 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 11/06/2006 | 11/08/2006 | J. Paul Smith Construction | 14.00 | 1 |
| 04/03/2006 | 04/04/2006 | J. Paul Smith Construction | 4.50 | 1 |
| 03/08/2006 | 03/16/2006 | J. Paul Smith Construction | 31.75 | 2 |
| 10/03/2005 | 10/03/2005 | J. Paul Smith Construction | 2.00 | 1 |
| 09/08/2005 | 09/09/2005 | J. Paul Smith Construction | 0.00 | 0 |
| 08/01/2005 | 08/01/2005 | J. Paul Smith Construction | 1.50 | 1 |
| 06/21/2005 | 06/21/2005 | J. Paul Smith Construction | 2.00 | 1 |
| 01/19/2005 | 02/07/2005 | J. Paul Smith Construction | 37.00 | 1 |