Drake Pit — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
12/09/2025 12/10/2025 Big River Excavating 5.00 1
09/08/2025 09/08/2025 Big River Excavating 2.50 1
04/09/2025 04/09/2025 Big River Excavating 4.75 1
10/15/2024 10/25/2024 Big River Excavating 11.50 1
06/17/2024 06/20/2024 Big River Excavating 9.50 1
01/03/2024 01/03/2024 Big River Excavating 4.00 1
04/20/2023 04/20/2023 Big River Excavating 4.00 1
11/01/2022 11/03/2022 Big River Excavating 19.50 1
08/11/2022 08/11/2022 Big River Excavating 9.00 1
03/24/2022 03/29/2022 Big River Excavating 7.50 1
08/02/2021 08/04/2021 Big River Excavating 13.50 1
12/02/2020 12/03/2020 Big River Excavating 7.25 1
04/06/2020 04/09/2020 Big River Excavating 10.75 1
01/13/2020 01/16/2020 Big River Excavating 18.50 1
10/15/2018 10/22/2018 Big River Excavating 15.25 1
06/19/2018 06/20/2018 Big River Excavating 10.50 1
06/06/2017 06/08/2017 Big River Excavating 6.50 1
01/11/2017 01/11/2017 Big River Excavating 4.25 1
10/13/2016 10/13/2016 Big River Excavating 9.00 1
08/05/2016 08/05/2016 Big River Excavating 7.50 1
05/11/2016 05/11/2016 Big River Excavating 5.50 1
01/11/2016 01/13/2016 Big River Excavating 10.00 1
08/12/2015 08/12/2015 Big River Excavating 5.50 1
05/28/2015 05/29/2015 Big River Excavating 17.75 1
12/09/2014 01/15/2015 Big River Excavating 44.25 1