Dredge 3 — Inspections

Total: 16 inspections

Begin End Operator Hours Inspectors
03/27/2025 04/04/2025 Vontz Paving, Inc 19.50 1
10/24/2023 10/24/2023 Vontz Paving, Inc 5.50 1
10/24/2022 10/24/2022 Vontz Paving, Inc 5.75 1
11/08/2021 11/08/2021 Vontz Paving, Inc 2.00 1
10/27/2021 10/27/2021 Vontz Paving, Inc 11.50 1
03/15/2021 03/16/2021 Vontz Paving, Inc 18.75 1
06/29/2020 06/29/2020 Vontz Paving, Inc 14.75 1
11/28/2017 11/28/2017 Vontz Paving, Inc 11.75 1
06/08/2017 06/08/2017 Vontz Paving, Inc 9.00 1
05/17/2017 05/18/2017 Vontz Paving, Inc 33.50 1
04/21/2015 04/21/2015 Vontz Paving, Inc 2.50 1
04/29/2014 04/29/2014 Vontz Paving, Inc 17.50 1
04/03/2013 04/03/2013 Vontz Paving, Inc 16.75 1
11/08/2011 11/09/2011 Vontz Paving, Inc 22.00 1
04/13/2011 04/13/2011 Vontz Paving, Inc 11.75 1
04/12/2011 04/12/2011 Vontz Paving, Inc 19.00 1