Dredge V — Inspections

Total: 18 inspections

Begin End Operator Hours Inspectors
02/26/2018 02/26/2018 Pine Bluff Materials 7.75 1
05/30/2017 05/30/2017 Pine Bluff Materials 4.50 1
02/13/2017 02/16/2017 Pine Bluff Materials 18.00 1
08/16/2016 08/16/2016 Hunter Sand & Gravel, LLC. 1.00 1
08/04/2016 08/04/2016 Hunter Sand & Gravel, LLC. 1.00 1
08/03/2016 08/04/2016 Hunter Sand & Gravel, LLC. 18.25 1
03/24/2016 03/24/2016 Hunter Sand & Gravel, LLC. 0.25 1
03/24/2016 03/24/2016 Hunter Sand & Gravel, LLC. 10.75 1
07/01/2015 07/01/2015 Hunter Sand & Gravel, LLC. 9.25 1
07/01/2015 07/01/2015 Hunter Sand & Gravel, LLC. 0.25 1
03/17/2015 03/17/2015 Hunter Sand & Gravel, LLC. 0.75 1
03/16/2015 03/16/2015 Hunter Sand & Gravel, LLC. 9.50 1
12/04/2013 12/04/2013 Hunter Sand & Gravel, LLC. 6.75 1
05/22/2013 05/22/2013 Hunter Sand & Gravel, LLC. 4.00 1
11/07/2011 11/09/2011 Hunter Sand & Gravel, LLC. 21.50 1
03/15/2011 03/15/2011 Hunter Sand & Gravel, LLC. 7.75 1
03/18/2010 03/22/2010 IMI South, LLC 7.75 1
01/07/2010 01/07/2010 IMI South, LLC 2.25 1