DRY CREEK PLANT — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
07/24/2002 07/24/2002 Artesia Ready Mix Concrete Inc 3.00 1
05/22/2002 05/22/2002 Artesia Ready Mix Concrete Inc 12.00 1
03/14/2002 03/14/2002 Artesia Ready Mix Concrete Inc 6.00 1
03/05/2002 03/07/2002 Artesia Ready Mix Concrete Inc 37.00 1
08/09/2001 08/09/2001 Artesia Ready Mix Concrete Inc 8.00 2
08/02/2001 08/02/2001 Artesia Ready Mix Concrete Inc 4.00 1
07/31/2001 08/02/2001 Artesia Ready Mix Concrete Inc 18.00 1
08/08/2000 08/10/2000 Artesia Ready Mix Concrete Inc 17.00 1