Dundas Job — Inspections
Total: 79 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 12/13/2004 | 12/13/2004 | Waterloo Coal Co., Inc. | 10.00 | 1 |
| 10/20/2004 | 10/20/2004 | Waterloo Coal Co., Inc. | 6.00 | 1 |
| 10/18/2004 | 10/18/2004 | Waterloo Coal Co., Inc. | 6.00 | 1 |
| 10/13/2004 | 10/20/2004 | Waterloo Coal Co., Inc. | 46.00 | 1 |
| 04/13/2004 | 04/15/2004 | Waterloo Coal Co., Inc. | 29.00 | 1 |
| 01/07/2004 | 01/07/2004 | Waterloo Coal Co., Inc. | 12.00 | 1 |
| 12/17/2003 | 12/17/2003 | Waterloo Coal Co., Inc. | 12.00 | 1 |
| 12/08/2003 | 12/10/2003 | Waterloo Coal Co., Inc. | 32.00 | 1 |
| 04/16/2003 | 05/05/2003 | Waterloo Coal Co., Inc. | 40.00 | 1 |
| 12/11/2002 | 12/12/2002 | Waterloo Coal Co., Inc. | 7.00 | 1 |
| 10/15/2002 | 10/15/2002 | Waterloo Coal Co., Inc. | 5.00 | 1 |
| 10/08/2002 | 10/08/2002 | Waterloo Coal Co., Inc. | 5.50 | 1 |
| 10/07/2002 | 10/07/2002 | Waterloo Coal Co., Inc. | 7.50 | 1 |
| 10/01/2002 | 10/16/2002 | Waterloo Coal Co., Inc. | 67.00 | 1 |
| 07/10/2002 | 07/10/2002 | Waterloo Coal Co., Inc. | 13.00 | 1 |
| 06/19/2002 | 06/19/2002 | Waterloo Coal Co., Inc. | 13.00 | 1 |
| 06/18/2002 | 07/15/2002 | Waterloo Coal Co., Inc. | 45.50 | 1 |
| 02/19/2002 | 03/12/2002 | Waterloo Coal Co., Inc. | 35.00 | 1 |
| 07/11/2001 | 07/11/2001 | Waterloo Coal Co., Inc. | 9.00 | 1 |
| 07/10/2001 | 07/10/2001 | Waterloo Coal Co., Inc. | 8.00 | 1 |
| 05/21/2001 | 07/12/2001 | Waterloo Coal Co., Inc. | 62.00 | 1 |
| 02/26/2001 | 03/21/2001 | Waterloo Coal Co., Inc. | 73.50 | 2 |
| 08/21/2000 | 08/21/2000 | Waterloo Coal Co., Inc. | 9.00 | 1 |
| 08/03/2000 | 08/03/2000 | Waterloo Coal Co., Inc. | 1.00 | 1 |
| 06/28/2000 | 07/19/2000 | Waterloo Coal Co., Inc. | 71.00 | 2 |
| 06/26/2000 | 06/26/2000 | Waterloo Coal Co., Inc. | 2.00 | 1 |
| 05/08/2000 | 05/09/2000 | Waterloo Coal Co., Inc. | 17.50 | 1 |
| 03/22/2000 | 03/24/2000 | Waterloo Coal Co., Inc. | 24.00 | 1 |
| 01/24/2000 | 02/09/2000 | Waterloo Coal Co., Inc. | 80.00 | 1 |