Total: 10 inspections

Begin End Operator Hours Inspectors
01/29/2003 01/29/2003 E & A Materials Inc 2.00 1
10/15/2002 10/15/2002 E & A Materials Inc 0.00 0
08/12/2002 08/16/2002 E & A Materials Inc 12.00 1
04/15/2002 04/16/2002 E & A Materials Inc 0.00 0
08/07/2001 08/07/2001 E & A Materials Inc 18.00 1
10/24/2000 10/24/2000 E & A Materials Inc 14.00 1
10/24/2000 10/24/2000 E & A Materials Inc 1.00 1
09/14/2000 09/14/2000 E & A Materials Inc 5.00 1
08/23/2000 08/23/2000 E & A Materials Inc 4.00 1
08/09/2000 08/09/2000 E & A Materials Inc 22.00 2