Eagle Creek No 5 Mine — Inspections

Total: 52 inspections

Begin End Operator Hours Inspectors
04/21/2000 05/26/2000 Hobet Mining Inc 51.00 1
02/14/2000 03/15/2000 Hobet Mining Inc 16.00 1