Eldorado Project — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
06/03/2004 06/03/2004 Cactus Mining Corporation 1.00 1
03/09/2004 03/09/2004 Cactus Mining Corporation 9.00 1
01/08/2004 01/15/2004 Cactus Mining Corporation 24.00 1
09/10/2003 09/11/2003 Cactus Mining Corporation 16.00 1
06/26/2003 07/02/2003 Cactus Mining Corporation 31.00 1