Eldredge #2 Tipple — Inspections

Total: 29 inspections

Begin End Operator Hours Inspectors
02/19/2008 02/21/2008 Vance River Terminal Inc 21.00 1
09/10/2007 09/12/2007 Vance River Terminal Inc 16.00 1
07/12/2007 07/31/2007 Vance River Terminal Inc 26.00 1
11/08/2006 12/01/2006 Vance River Terminal Inc 19.00 1
04/13/2006 04/14/2006 Vance River Terminal Inc 14.50 1
10/17/2005 10/25/2005 Vance River Terminal Inc 22.00 1
06/03/2005 06/07/2005 Vance River Terminal Inc 16.50 1
01/11/2005 01/11/2005 Vance River Terminal Inc 1.00 1
01/11/2005 01/11/2005 Vance River Terminal Inc 1.25 1
01/11/2005 01/11/2005 Vance River Terminal Inc 9.25 1
05/27/2004 05/27/2004 Vance River Terminal Inc 9.00 1
05/05/2004 05/17/2004 Vance River Terminal Inc 16.50 1
05/05/2004 05/05/2004 Vance River Terminal Inc 2.00 1
01/23/2004 01/23/2004 Vance River Terminal Inc 2.00 1
11/04/2003 11/04/2003 Vance River Terminal Inc 2.00 1
10/06/2003 10/06/2003 Vance River Terminal Inc 1.75 1
10/06/2003 10/06/2003 Vance River Terminal Inc 9.50 1
05/12/2003 05/13/2003 Vance River Terminal Inc 12.50 1
01/13/2003 01/15/2003 Vance River Terminal Inc 2.00 1
01/13/2003 01/15/2003 Vance River Terminal Inc 10.50 1
05/23/2002 05/30/2002 Vance River Terminal Inc 13.50 1
11/29/2001 11/29/2001 Vance River Terminal Inc 1.75 1
11/29/2001 11/29/2001 Vance River Terminal Inc 9.25 1
07/25/2001 07/26/2001 Vance River Terminal Inc 12.00 1
03/21/2001 04/30/2001 Vance River Terminal Inc 9.25 1
03/21/2001 03/21/2001 Vance River Terminal Inc 1.75 1
07/24/2000 07/24/2000 Vance River Terminal Inc 11.00 1
02/22/2000 02/22/2000 Vance River Terminal Inc 9.25 1
02/22/2000 02/22/2000 Vance River Terminal Inc 1.50 1