Elk Heights Pit — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
03/06/2025 03/06/2025 KLB Construction LLC 11.00 1
01/31/2025 02/01/2025 KLB Construction LLC 5.00 1
06/04/2024 06/04/2024 Elk Heights Pit LLC 7.00 1
03/21/2024 03/22/2024 Elk Heights Pit LLC 11.00 1
09/18/2023 09/18/2023 Elk Heights Pit LLC 9.75 1
07/13/2023 07/13/2023 Elk Heights Pit LLC 9.00 1
05/17/2023 05/17/2023 Elk Heights Pit LLC 1.25 1
08/04/2022 08/06/2022 Elk Heights Pit LLC 6.00 1
09/27/2021 10/04/2021 Elk Heights Pit LLC 3.00 1
04/05/2021 04/07/2021 Elk Heights Pit LLC 22.00 1
07/14/2020 07/14/2020 Elk Heights Pit LLC 19.50 1