ELK RIVER PIT — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
10/17/2001 10/19/2001 Elk River Bituminous Inc 14.00 1
08/23/2000 08/25/2000 Elk River Bituminous Inc 16.00 1
04/26/2000 04/26/2000 Elk River Bituminous Inc 7.00 2