Eunice — Inspections

Total: 60 inspections

Begin End Operator Hours Inspectors
11/14/2002 11/14/2002 Wallach Concrete Inc 14.00 1
10/15/2002 10/15/2002 Wallach Concrete Inc 3.00 1
07/02/2002 07/02/2002 Wallach Concrete Inc 6.00 1
07/02/2002 07/02/2002 Wallach Concrete Inc 4.00 1
12/27/2001 12/27/2001 Wallach Concrete Inc 8.00 1
11/14/2001 11/15/2001 Wallach Concrete Inc 0.00 0
10/02/2001 10/03/2001 Wallach Concrete Inc 6.00 1
07/05/2001 07/09/2001 Wallach Concrete Inc 16.00 1
07/06/2000 07/06/2000 Wallach Concrete Inc 25.00 1
05/31/2000 06/01/2000 Wallach Concrete Inc 31.00 1