Evan's Fork — Inspections

Total: 67 inspections

Begin End Operator Hours Inspectors
04/12/2001 07/09/2001 Addington Mining, Inc 84.00 4
04/06/2001 04/06/2001 Addington Mining, Inc 8.00 1
03/15/2001 03/15/2001 Addington Mining, Inc 5.00 1
02/15/2001 02/15/2001 Addington Mining, Inc 5.00 1
01/31/2001 02/15/2001 Addington Mining, Inc 13.00 1
01/29/2001 01/31/2001 Addington Mining, Inc 7.00 1
12/19/2000 01/19/2001 Addington Mining, Inc 6.00 1
11/30/2000 01/25/2001 Addington Mining, Inc 84.50 6
11/01/2000 03/15/2001 Addington Mining, Inc 122.00 1
09/20/2000 10/13/2000 Addington Mining, Inc 26.00 1
07/27/2000 07/28/2000 Addington Mining, Inc 8.00 1
06/02/2000 07/03/2000 Addington Mining, Inc 7.00 1
06/02/2000 06/07/2000 Addington Mining, Inc 5.00 1
04/17/2000 07/13/2000 Addington Mining, Inc 98.75 2
03/14/2000 03/14/2000 Addington Mining, Inc 4.00 1
03/07/2000 03/14/2000 Addington Mining, Inc 13.50 1
02/16/2000 02/16/2000 Addington Mining, Inc 3.50 1