EVTAC PLANT — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
10/31/2003 10/31/2003 EVTAC Mining 6.00 1
01/02/2003 03/19/2003 EVTAC Mining 162.00 2
09/03/2002 09/27/2002 EVTAC Mining 176.00 2
01/22/2002 03/21/2002 EVTAC Mining 233.00 1
08/20/2001 09/21/2001 EVTAC Mining 167.00 1
03/14/2001 03/15/2001 EVTAC Mining 15.00 1
12/14/2000 01/23/2001 EVTAC Mining 176.00 2
11/28/2000 12/01/2000 EVTAC Mining 22.00 1
08/14/2000 09/29/2000 EVTAC Mining 226.00 1
02/23/2000 02/28/2000 EVTAC Mining 15.00 1
01/11/2000 04/10/2000 EVTAC Mining 286.00 1