Fabtec 45II Cone Screen Plant — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
03/20/2018 03/20/2018 Pelino Inc 6.25 1
02/28/2018 03/01/2018 Pelino Inc 8.25 1
05/02/2017 05/02/2017 Pelino Inc 1.00 1
04/27/2017 04/28/2017 Pelino Inc 6.75 1
10/30/2013 11/12/2013 Pelino Inc 19.50 1
11/29/2012 11/29/2012 Pelino Inc 9.25 1
12/13/2011 12/14/2011 Pelino Inc 15.00 1
07/21/2009 07/27/2009 Pelino Inc 1.50 1
03/12/2009 03/13/2009 Pelino Inc 9.00 1
02/04/2009 02/04/2009 Pelino Inc 6.00 1
02/04/2009 02/04/2009 Pelino Inc 4.75 1
04/23/2008 04/30/2008 Pelino Inc 30.00 1