Fabtech Wash Plant — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
07/09/2025 07/09/2025 Powder River Sand and Gravel 2.75 1
04/10/2024 04/10/2024 Powder River Sand and Gravel 5.00 1
06/25/2023 07/18/2023 Powder River Sand and Gravel 17.25 1