FINLAY 390 SCREEN — Inspections
Total: 17 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/03/2014 | 09/03/2014 | Bolen Asphalt Paving Inc | 6.50 | 1 |
| 09/10/2013 | 09/10/2013 | Bolen Asphalt Paving Inc | 2.75 | 1 |
| 09/21/2011 | 09/21/2011 | Bolen Asphalt Paving Inc | 2.00 | 1 |
| 07/20/2011 | 07/20/2011 | Bolen Asphalt Paving Inc | 2.00 | 1 |
| 06/23/2010 | 06/23/2010 | Bolen Asphalt Paving Inc | 3.75 | 1 |
| 06/02/2009 | 06/02/2009 | Bolen Asphalt Paving Inc | 9.50 | 1 |
| 07/23/2008 | 07/24/2008 | Bolen Asphalt Paving Inc | 7.00 | 1 |
| 08/14/2007 | 08/14/2007 | Bolen Asphalt Paving Inc | 3.50 | 1 |
| 05/16/2006 | 05/17/2006 | Bolen Asphalt Paving Inc | 6.50 | 1 |
| 06/21/2005 | 06/21/2005 | Bolen Asphalt Paving Inc | 3.50 | 1 |
| 07/08/2004 | 07/08/2004 | Bolen Asphalt Paving Inc | 7.00 | 1 |
| 07/22/2003 | 07/23/2003 | Bolen Asphalt Paving Inc | 16.00 | 1 |
| 10/22/2002 | 10/22/2002 | Bolen Asphalt Paving Inc | 3.00 | 1 |
| 07/02/2002 | 07/02/2002 | Bolen Asphalt Paving Inc | 9.00 | 1 |
| 11/01/2000 | 11/01/2000 | Bolen Asphalt Paving Inc | 4.00 | 1 |
| 10/18/2000 | 10/18/2000 | Bolen Asphalt Paving Inc | 13.00 | 1 |
| 05/16/2000 | 05/16/2000 | Bolen Asphalt Paving Inc | 12.00 | 1 |