FINTEC 570 — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/26/2021 | 10/26/2021 | MEADVILLE REDI MIX CONCRETE | 6.50 | 1 |
| 05/04/2021 | 05/04/2021 | MEADVILLE REDI MIX CONCRETE | 9.00 | 1 |
| 06/25/2020 | 06/26/2020 | MEADVILLE REDI MIX CONCRETE | 2.50 | 1 |
| 06/22/2020 | 06/22/2020 | MEADVILLE REDI MIX CONCRETE | 2.50 | 1 |
| 06/09/2020 | 06/10/2020 | MEADVILLE REDI MIX CONCRETE | 10.75 | 1 |