FINTEC 570 — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
10/26/2021 10/26/2021 MEADVILLE REDI MIX CONCRETE 6.50 1
05/04/2021 05/04/2021 MEADVILLE REDI MIX CONCRETE 9.00 1
06/25/2020 06/26/2020 MEADVILLE REDI MIX CONCRETE 2.50 1
06/22/2020 06/22/2020 MEADVILLE REDI MIX CONCRETE 2.50 1
06/09/2020 06/10/2020 MEADVILLE REDI MIX CONCRETE 10.75 1