First Creek Mine — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
07/01/2014 07/01/2014 ICG Hazard, LLC 6.00 2
03/31/2014 03/31/2014 ICG Hazard, LLC 1.50 1
09/15/2008 09/15/2008 ICG Hazard, LLC 4.50 1
08/05/2008 08/05/2008 ICG Hazard, LLC 3.50 1