Flat Creek — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
04/22/2009 04/22/2009 Triad Mining Inc 2.00 1
03/16/2009 03/20/2009 Triad Mining Inc 49.75 2
07/23/2008 07/23/2008 Triad Mining Inc 7.00 1
06/20/2008 06/20/2008 Triad Mining Inc 20.00 2
03/20/2008 03/21/2008 Triad Mining Inc 31.00 2
09/29/2007 10/16/2007 Triad Mining Inc 43.00 2
02/14/2007 03/29/2007 Triad Mining Inc 48.00 3