Flint Hill Mine — Inspections

Total: 24 inspections

Begin End Operator Hours Inspectors
03/20/2008 03/20/2008 Triad Mining Inc 3.00 1
10/05/2006 10/05/2006 Triad Mining Inc 4.00 1
09/21/2005 03/30/2006 Triad Mining Inc 19.75 2
07/06/2005 07/07/2005 Triad Mining Inc 17.50 1
02/08/2005 02/08/2005 Triad Mining Inc 10.00 2
02/08/2005 03/31/2005 Triad Mining Inc 30.00 2
04/29/2004 05/11/2004 Triad Mining Inc 22.00 1
03/03/2004 03/03/2004 Triad Mining Inc 22.00 2
07/10/2003 07/30/2003 Triad Mining Inc 7.00 1
03/26/2003 03/26/2003 Triad Mining Inc 4.00 1
01/23/2003 02/11/2003 Triad Mining Inc 28.50 1
12/11/2002 12/11/2002 Triad Mining Inc 4.00 1
09/25/2002 09/25/2002 Triad Mining Inc 4.00 1
08/12/2002 08/29/2002 Triad Mining Inc 13.00 1
07/17/2002 07/17/2002 Triad Mining Inc 9.00 1
06/12/2002 06/12/2002 Triad Mining Inc 3.50 1
02/11/2002 02/11/2002 Triad Mining Inc 3.00 1
01/14/2002 04/08/2002 Triad Mining Inc 32.00 1
12/27/2001 01/28/2002 Triad Mining Inc 22.00 2
10/22/2001 01/28/2002 Triad Mining Inc 42.00 2
10/10/2001 10/10/2001 Triad Mining Inc 13.75 1
07/19/2001 08/27/2001 Triad Mining Inc 42.50 3
05/18/2001 05/18/2001 Triad Mining Inc 7.00 1
03/14/2001 03/14/2001 Triad Mining Inc 3.00 1