Fork Creek No 10 Mine — Inspections

Total: 54 inspections

Begin End Operator Hours Inspectors
04/27/2010 04/29/2010 Coal River Mining LLC 16.00 1
04/27/2010 05/20/2010 Coal River Mining LLC 128.25 3
01/06/2010 01/19/2010 Coal River Mining LLC 18.50 1
12/16/2009 12/16/2009 Coal River Mining LLC 20.25 2