Fox River Quarry — Inspections

Total: 21 inspections

Begin End Operator Hours Inspectors
12/04/2007 12/05/2007 Lafarge Fox River Inc 10.00 1
05/07/2007 05/10/2007 Lafarge Fox River Inc 22.25 1
12/12/2006 12/13/2006 Lafarge Fox River Inc 23.25 2
08/01/2006 08/02/2006 Lafarge Fox River Inc 11.50 1
11/30/2005 12/01/2005 Lafarge Fox River Inc 13.50 1
01/24/2005 01/25/2005 Lafarge Fox River Inc 11.00 1
10/05/2004 10/06/2004 Lafarge Fox River Inc 32.00 1
03/09/2004 03/10/2004 Lafarge Fox River Inc 33.00 2
08/12/2003 08/12/2003 Lafarge Fox River Inc 2.00 1
08/11/2003 08/11/2003 Lafarge Fox River Inc 5.00 1
07/22/2003 07/31/2003 Lafarge Fox River Inc 49.00 1
07/16/2003 07/16/2003 Lafarge Fox River Inc 39.00 2
02/11/2003 02/12/2003 Lafarge Fox River Inc 21.00 1
10/16/2002 10/16/2002 Lafarge Fox River Inc 5.00 1
07/08/2002 07/11/2002 Lafarge Fox River Inc 37.00 1
07/30/2001 07/30/2001 Lafarge Fox River Inc 2.00 1
07/27/2001 07/27/2001 Lafarge Fox River Inc 6.00 1
07/27/2001 07/30/2001 Lafarge Fox River Inc 8.00 1
06/19/2001 06/27/2001 Lafarge Fox River Inc 77.00 1
07/11/2000 07/11/2000 Lafarge Fox River Inc 3.00 1
06/26/2000 06/30/2000 Lafarge Fox River Inc 20.00 1