Freelandville Mine — Inspections

Total: 109 inspections

Begin End Operator Hours Inspectors
02/08/2001 02/08/2001 Triad Mining Inc 8.00 1
01/23/2001 01/23/2001 Triad Mining Inc 7.00 1
01/23/2001 01/23/2001 Triad Mining Inc 7.00 1
01/22/2001 01/25/2001 Triad Mining Inc 37.50 1
06/29/2000 07/05/2000 Triad Mining Inc 26.00 1
05/15/2000 09/28/2000 Triad Mining Inc 7.00 1
05/15/2000 05/15/2000 Triad Mining Inc 6.50 1
04/03/2000 04/03/2000 Triad Mining Inc 9.50 1
03/14/2000 03/15/2000 Triad Mining Inc 17.00 1